1997 Moonen Custom Built Motor Yacht

EUR  2,746,997
Malasia
¿Interesado en este barco? Teléfono: +604 9665154
  • Descripción
  • Ver especificaciones completas
 
Año:
1997
Longitud:
34m
Tipo de motor/combustible:
/
Situado en:
Malasia
Material del casco:
Acero
YW#:
78000-2975051
Precio actual:
US$ 2,950,000 (EUR  2,746,997) 

'Azul A' is a fine example of the premium quality design, engineering and construction that Dutch Yacht builders are famed for, she represents excellent value for money in today's second hand market.
The accommodation is full width from midships going forward, this allows for an impressive 200 m² of interior volume and larger than average master suite. Immaculate dark wood panelling throughout the Boat is tastefully contrasted with lighter carpets, fabrics and furnishings lending a sumptuous ambience to ones time on-board.
The raised pilot house has ample space and sofa style seating, providing owner's and guests another comfortable, panoramic area to enjoy sea voyages.
Her main engines have logged less than 6000 hours since new, that averages out to less than 300 hours cruising per year, consequently many other systems on the Vessel are similarly lightly used.
Her current Owner, since early 2013, has carried out a very comprehensive schedule of maintenance and upgrade since purchase, a brief summary follows :

March - May 2013, Tecnopool Shipyard Genoa Italy.

Haul out for general maintenance and to bring the vessel back into ABS Class. Hull and Machinery survey, and LSA Survey, under the supervision of Capt John Marcus, of Marine Consultants Jens Cornelson Ltd, Germany. Records available on request.

November 2013, Puteri Marina Malaysia.

New KVH Tracphone & Tracvision antennas fitted. CCTV and Cisco WiFi routers installed. Yacht-spot 3G WiFi antenna mounted. Flir Thermal Image camera installed. Interior entertainment system installed and TV’s replaced. Both Main Engines received a 5,000 hr Top-end overhaul to caterpillar standard. Records available on request.

December 2013, Penguin Shipyard Singapore.

Haul out to replace complete bearing and seals for the oil bath shafts system. Work was carried out by maker, Rubber Design technician to class standard. Shafts removed and checked for true. Starboard Generator received a 10,000 hr top-end overhaul to Northern Lights standard. Both alternators were acid washed, re-varnished and serviced. General maintenance during dry docking, replaced all toilets for new self-macerating Tecma toilets with integrated bidet. Records available on request. New carpets fitted throughout the owner’s and guest areas.

June - September 2014, Boustead Shipyard Langkawi.

Underwater section Grit Blasted to bare steel primed and antifouled with Jotun coating system. Removed Bow thruster for servicing replaced main bearings. Removed passarelle to service hydraulics and replace rotation chain, sprocket and main bearings. Fitted new Cathelco cathodic antifouling system, removed bilge manifold for cleaning and pressure testing, replace any failed pipes. Cleaned and pressure tested M/E oil coolers and heat exchangers. Serviced the boat crane and replace the bushing to the main pivot bracket. Fitted Aqualuma LED underwater lights. Records available on request. New Wheelhouse console installed and new navigation system fitted. New ceiling panels installed throughout the vessel.
January 2016, Boustead Shipyard Langkawi.
The works and maintenance carried out during the November & December 2015 refit.
Engineering:
Carry out inspection on seals and overhaul shaft oil bath stern tube system
Remove shaft coupling
Remove stern tube seals
Carry out inspection of shaft seals
Remove shafts and check for straightness and general condition
Renew shafts seals
Remove and install propeller
Remove and reinstall shaft 150mm ф

General services (Grey water tank):

Manual cleaning of grey water tank
Renewal of gasket for man hole cover

Engineering:

Bow thruster
Remove and reinstall bow thruster propeller (0.5m)
Remove and reinstall bow thruster motor with new rubber base
Greasing and polishing propeller

Water Cooling pump for hydraulic Line port side
Remove pump
Inspect and repair
Reinstall pump

Sea chest & Butterfly Valves
Masking & preparation
Excess work
Inspection and maintenance of butterfly valve (2units)
Cleaning marine growth in sea chest (port & stbd)
Propeller (2 Units)
Greasing and polishing (1.2m)

Anchor Locker Deck Hatches
Masking & preparation
Cleaning hatch hole side wall
Build-up hatch hole side wall
Replace hatch rubber seal

Swim Platform
Remove and reinstall hatch (Replace damaged gasket/sikaflex)
Inspect passerelle mechanich and lubricate as needed

Fitout (Underwater Light -1 unit):
Remove damaged sikaflex
Cleaning, masking & preparation
Apply new sikaflex

Propeller (2 units x 1.2m) & Bow thruster prop (1 unit x 0.5 m)
Masking & preparation
Apply Propspeed (roller application)


The vessel completed all her ABS class surveys including the shafts survey. All surveys passed with no condition.
Prior to the surveys, the crew removed for acid cleaning both raw water heat exchangers and associated pipework, for the main engines. This is a must every two years given the prolific growth in S/E Asia. During this time, new Catheclo anodes (cathodic antifouling for all seawater cooled systems) were installed by the crew.

The Vessel is normally to be found in either Langkawi or Phuket.





Please contact Paul Jackson at +604 9665154 or +60 174196933

¿Interesado en este barco? Teléfono: +604 9665154

Otros barcos de Yacht Brokerage and Charters

Ver todos los barcos de Yacht Brokerage and Charters
Visitar Website
Email Us
Por favor ingrese un nombre válido
Por favor ingrese una dirección de correo electrónico válida
RE: Moonen Custom Built Motor Yacht, Malasia
El mensaje no puede estar vacío
Enviando...

Yacht Brokerage and Charters

NO. 62, Persiaran Mutiara,
Pusat Dagangan Kelana Mas,
Langkawi
Malaysia

Yacht Brokerage and Charters
Por favor ingrese un nombre válido
Por favor ingrese una dirección de correo electrónico válida
El mensaje no puede estar vacío
Enviando...